Line 33: Line 33:
 
4/13/09 - O2 cylinder needs to be refilled.
 
4/13/09 - O2 cylinder needs to be refilled.
 
   
 
   
4/13/09 - replace the Workers comp form with new version in all forms modules. http://www.dir.ca.gov/dwc/WCFaqIW.html
+
4/13/09 - replace the Workers comp form with new version in all forms modules.  
 +
http://www.dir.ca.gov/dwc/WCFaqIW.html
  
 
4/12/09- 1) The flexible horned sled is missing a pin on the handles.
 
4/12/09- 1) The flexible horned sled is missing a pin on the handles.
Line 41: Line 42:
 
4/12/09- 3) The plywood board used to level the bottom of the non-separable sled was warped severely, possibly due to water damage through out the season.
 
4/12/09- 3) The plywood board used to level the bottom of the non-separable sled was warped severely, possibly due to water damage through out the season.
  
4/12/09- 4) There was a sled under the stairway of the chalet that was moved to the outside of the equipment shed as there was not enough room to store it inside.
+
4/12/09- 4) The Castle Pass cache was using one chain to secure the ladder and the sled.  This is not optional.  A new chain is recommended upon installation of the cache next year.
  
4/12/09- 5) The Castle Pass cache was using one chain to secure the ladder and the sled.  This is not optional.  A new chain is recommended upon installation of the cache next year.
+
4/12/09- 5) There were two locks on the Castle Pass cache securing the ladder and the sled.
 
+
4/12/09- 6) There were two locks on the Castle Pass cache securing the ladder and the sled.  The lack securing the ladder was set to 0607 and was removed.  There is one lock securing the ladder with combo 8277.
+

Revision as of 16:07, 14 April 2009

WHEN YOU COMPLETE AN ITEM, DELETE FROM THE LIST

Posted 1/27/09- Some patrol members and candidates are not aware of the locations of the CP caches.

1/27/09 - Toboggan belt buckle is cracked.

1/27/09 - from patrol 12/20/08

 A. Castle pass cache issues:

   (1) One O2 had insufficient pressure and needs to be refilled and taken into the cache;   

   (2) The chain that locks the backboard and Cascade sled to the tree was missing and needs to be taken in and added

   (3) The long probe poles were missing   


 B. Round valley cache issues:  

   (1) The long probe poles were missing.

1/27/09 - Print the new Tahoe Meadows Sno-Mo closure map and put in TM forms module, and post. File is found on the TBSP Docs site.

2/4/09 - make a guidon cord with laminated card and flags for each cache

4/13/09 - make laminated card showing the Extended Compression Test.

4/13/09 - replace all BK radio cards.

4/13/09 - create an ICOM radio card.

4/13/09 - O2 cylinder needs to be refilled.

4/13/09 - replace the Workers comp form with new version in all forms modules. http://www.dir.ca.gov/dwc/WCFaqIW.html

4/12/09- 1) The flexible horned sled is missing a pin on the handles.

4/12/09- 2) Three rope hauling kits were not quire dry before they had to be put into the shed for the season. They were left open to dry, it maybe be helpful to know that they are indeed dry or air dry them on a sunny day.

4/12/09- 3) The plywood board used to level the bottom of the non-separable sled was warped severely, possibly due to water damage through out the season.

4/12/09- 4) The Castle Pass cache was using one chain to secure the ladder and the sled. This is not optional. A new chain is recommended upon installation of the cache next year.

4/12/09- 5) There were two locks on the Castle Pass cache securing the ladder and the sled.