Operations - things to fix

From TBSPedia
Revision as of 11:25, 13 April 2009 by EricChesmar (Talk | contribs)

Jump to: navigation, search

WHEN YOU COMPLETE AN ITEM, DELETE FROM THE LIST

Posted 1/27/09- Some patrol members and candidates are not aware of the locations of the CP caches.

1/27/09 - Toboggan belt buckle is cracked.

1/27/09 - from patrol 12/20/08

 A. Castle pass cache issues:

   (1) One O2 had insufficient pressure and needs to be refilled and taken into the cache;   

   (2) The chain that locks the backboard and Cascade sled to the tree was missing and needs to be taken in and added

   (3) The long probe poles were missing   


 B. Round valley cache issues:  

   (1) The long probe poles were missing.

1/27/09 - Print the new Tahoe Meadows Sno-Mo closure map and put in TM forms module, and post. File is found on the TBSP Docs site.

2/4/09 - make a guidon cord with laminated card and flags for each cache

4/13/09 - make laminated card showing the Extended Compression Test.

4/13/09 - replace all BK radio cards.

4/13/09 - create an ICOM radio card.

4/13/09 - O2 cylinder needs to be refilled.

4/13/09 - replace the Workers comp form with new version in all forms modules. http://www.dir.ca.gov/dwc/WCFaqIW.html

Personal tools
Namespaces

Variants
Actions
Tools
Resources
Toolbox