Difference between revisions of "Training Videos"

From TBSPedia
Jump to: navigation, search
Line 4: Line 4:
  
 
# Discussion of components, How it comes out of the bag
 
# Discussion of components, How it comes out of the bag
# Individual Components
+
##Switching from Raising to Lowering System
# Switching from Raising to Lowering System
+
 
# Anchors
 
# Anchors
# BFT
+
## BFT
# T-Slot
+
## T-Slot
# Anchor selection (fall line, other considerations)
+
## Anchor selection (fall line, other considerations)
# Pickets
+
## Pickets
# Cordelette
+
## Cordelette
 
# OEC Procedures
 
# OEC Procedures
# Getting patient onto belay
+
## Getting patient onto belay
# Hasty harness for patients
+
## Hasty harness for patients
# Attaching patient to mainline
+
## Attaching patient to mainline
# Attaching mainline to sled
+
## Attaching mainline to sled
 
# Mainline
 
# Mainline
# Flaking
+
## Flaking
# attaching to anchor
+
## attaching to anchor
 
# Belay line
 
# Belay line
# Anchoring and considerations
+
## Anchoring and considerations
# Rescuer belay vs patient belay
+
## Rescuer belay vs patient belay
 
# Raising and Lowering
 
# Raising and Lowering
# Taking up slack on belay line
+
## Taking up slack on belay line
# Repacking
+
## Repacking
  
 
== Complex Scenarios ==
 
== Complex Scenarios ==
 
# CHP Rescue Helicopter Capabilities
 
# CHP Rescue Helicopter Capabilities
# Bauman Bag
+
## Bauman Bag
# Rescue Sling
+
## Rescue Sling
# Diaper Sling
+
## Diaper Sling
 
# Non Helicopter Rescue
 
# Non Helicopter Rescue
 
  # Rope Rescue with Trauma - consider filming on drainages above castle meadow
 
  # Rope Rescue with Trauma - consider filming on drainages above castle meadow
Line 48: Line 47:
  
 
# Grid coordinates
 
# Grid coordinates
# 6-digit UTM coordinates
+
## 6-digit UTM coordinates
# lat/long scaler
+
## lat/long scaler
 
# bearings
 
# bearings
 
# resectioning
 
# resectioning
# Using the compass to obtain bearings
+
## Using the compass to obtain bearings
  
 
== Emergency Shelter ==
 
== Emergency Shelter ==
 
# Megamid
 
# Megamid
# Introduction  
+
## Introduction  
# Foot method
+
## Foot method
# Side Method
+
## Side Method
# Repacking  
+
## Repacking  
# In-Snow Setup
+
## In-Snow Setup
 
# Trench Shelter
 
# Trench Shelter
# Excavation  
+
## Excavation  
# Rigging Tarp
+
## Rigging Tarp
# Creating the roof
+
## Creating the roof

Revision as of 17:33, 18 March 2009

Videos for training

Contents

Rope Rescue

  1. Discussion of components, How it comes out of the bag
    1. Switching from Raising to Lowering System
  2. Anchors
    1. BFT
    2. T-Slot
    3. Anchor selection (fall line, other considerations)
    4. Pickets
    5. Cordelette
  3. OEC Procedures
    1. Getting patient onto belay
    2. Hasty harness for patients
    3. Attaching patient to mainline
    4. Attaching mainline to sled
  4. Mainline
    1. Flaking
    2. attaching to anchor
  5. Belay line
    1. Anchoring and considerations
    2. Rescuer belay vs patient belay
  6. Raising and Lowering
    1. Taking up slack on belay line
    2. Repacking

Complex Scenarios

  1. CHP Rescue Helicopter Capabilities
    1. Bauman Bag
    2. Rescue Sling
    3. Diaper Sling
  2. Non Helicopter Rescue
# Rope Rescue with Trauma - consider filming on drainages above castle meadow

Emergency Sleds

  1. Construction
  2. Transport

Medical

  1. Ensolite quick-splint
  2. Ski-Pole Traction Device

Orienteering and Navigation

  1. Grid coordinates
    1. 6-digit UTM coordinates
    2. lat/long scaler
  2. bearings
  3. resectioning
    1. Using the compass to obtain bearings

Emergency Shelter

  1. Megamid
    1. Introduction
    2. Foot method
    3. Side Method
    4. Repacking
    5. In-Snow Setup
  2. Trench Shelter
    1. Excavation
    2. Rigging Tarp
    3. Creating the roof
Personal tools
Namespaces

Variants
Actions
Tools
Resources
Toolbox