Difference between revisions of "Training Videos"
From TBSPedia
				
								
				
				
																
				
				
								
				GregMarsden  (Talk | contribs)  | 
			GregMarsden  (Talk | contribs)   | 
			||
| Line 4: | Line 4: | ||
# Discussion of components, How it comes out of the bag  | # Discussion of components, How it comes out of the bag  | ||
| − | + | ##Switching from Raising to Lowering System  | |
| − | # Switching from Raising to Lowering System  | + | |
# Anchors  | # Anchors  | ||
| − | + | ## BFT  | |
| − | + | ## T-Slot  | |
| − | + | ## Anchor selection (fall line, other considerations)  | |
| − | + | ## Pickets  | |
| − | + | ## Cordelette  | |
# OEC Procedures  | # OEC Procedures  | ||
| − | + | ## Getting patient onto belay  | |
| − | + | ## Hasty harness for patients  | |
| − | + | ## Attaching patient to mainline  | |
| − | + | ## Attaching mainline to sled  | |
# Mainline  | # Mainline  | ||
| − | + | ## Flaking  | |
| − | + | ## attaching to anchor  | |
# Belay line  | # Belay line  | ||
| − | + | ## Anchoring and considerations  | |
| − | + | ## Rescuer belay vs patient belay  | |
# Raising and Lowering  | # Raising and Lowering  | ||
| − | + | ## Taking up slack on belay line  | |
| − | + | ## Repacking  | |
== Complex Scenarios ==  | == Complex Scenarios ==  | ||
# CHP Rescue Helicopter Capabilities  | # CHP Rescue Helicopter Capabilities  | ||
| − | + | ## Bauman Bag  | |
| − | + | ## Rescue Sling  | |
| − | + | ## Diaper Sling  | |
# Non Helicopter Rescue  | # Non Helicopter Rescue  | ||
  # Rope Rescue with Trauma - consider filming on drainages above castle meadow  |   # Rope Rescue with Trauma - consider filming on drainages above castle meadow  | ||
| Line 48: | Line 47: | ||
# Grid coordinates  | # Grid coordinates  | ||
| − | + | ## 6-digit UTM coordinates  | |
| − | + | ## lat/long scaler  | |
# bearings  | # bearings  | ||
# resectioning  | # resectioning  | ||
| − | + | ## Using the compass to obtain bearings  | |
== Emergency Shelter ==  | == Emergency Shelter ==  | ||
# Megamid  | # Megamid  | ||
| − | + | ## Introduction    | |
| − | + | ## Foot method  | |
| − | + | ## Side Method  | |
| − | + | ## Repacking    | |
| − | + | ## In-Snow Setup  | |
# Trench Shelter  | # Trench Shelter  | ||
| − | + | ## Excavation    | |
| − | + | ## Rigging Tarp  | |
| − | + | ## Creating the roof  | |
Revision as of 17:33, 18 March 2009
Videos for training
Contents | 
Rope Rescue
-  Discussion of components, How it comes out of the bag
- Switching from Raising to Lowering System
 
 -  Anchors
- BFT
 - T-Slot
 - Anchor selection (fall line, other considerations)
 - Pickets
 - Cordelette
 
 -  OEC Procedures
- Getting patient onto belay
 - Hasty harness for patients
 - Attaching patient to mainline
 - Attaching mainline to sled
 
 -  Mainline
- Flaking
 - attaching to anchor
 
 -  Belay line
- Anchoring and considerations
 - Rescuer belay vs patient belay
 
 -  Raising and Lowering
- Taking up slack on belay line
 - Repacking
 
 
Complex Scenarios
-  CHP Rescue Helicopter Capabilities
- Bauman Bag
 - Rescue Sling
 - Diaper Sling
 
 - Non Helicopter Rescue
 
# Rope Rescue with Trauma - consider filming on drainages above castle meadow
Emergency Sleds
- Construction
 - Transport
 
Medical
- Ensolite quick-splint
 - Ski-Pole Traction Device
 
-  Grid coordinates
- 6-digit UTM coordinates
 - lat/long scaler
 
 - bearings
 -  resectioning
- Using the compass to obtain bearings
 
 
Emergency Shelter
-  Megamid
- Introduction
 - Foot method
 - Side Method
 - Repacking
 - In-Snow Setup
 
 -  Trench Shelter
- Excavation
 - Rigging Tarp
 - Creating the roof